News

El 6 Develops MES System to Manage Multi-Stage Production

El 6 Group (Russia’s flagship carbon-graphite producer) has developed in-house industry-focused software for managing multi-stage production processes. In March, El 6 implemented its MES system for integrated serial accounting of finished products. By April 1, 2025, the company automated accounting of 92% of finished products at its plants in Novosibirsk and Novocherkassk.

The system developed at El 6 is an MES (Manufacturing Execution System) solution, a type of specialized production management software that ensures end-to-end traceability of each and every product. The system collects data from sensors at all stages of production, recording changes in each physical and technical characteristic. Complete information about any unit of product comes to a common track.

The system performs automatic collection and analysis of technological parameters, eliminates the human factor in monitoring production processes and helps the company improve the quality of its products for consumers.

“Each production facility has its own unique features, but in our case, the cost of error is quite high, and the process is multi-stage by nature. The chains include two to seven stages. Thus, we operate under a variety of basic scenarios. We were faced with a choice between an extremely deep customization of a ready-made solution that was available in the market and our in-house development. The project team created a common methodology and released an MVP. We piloted and introduced simple e-signatures to optimize document flow — in our case, it totals dozens of thousands of documents per month across the entire company. At the same time, all analytics involving data on finished products we get via our accounting system for all three plants is done in 1C; so we also built an integration layer to enable data exchange between our solution and 1C ERP. By the way, since our solution collects more detailed information about each unit, the types of reporting for the plants that employ it offer more opportunities,” comments project manager Oksana Koval.

According to Dmitry Semenov, Head of the Automation & IT Department, El 6 Novosibirsk, the performed activities covered 60% of MES functionality. At the same time, El 6 Novosibirsk is already creating a set of scenarios for accounting non-serial products manufactured according to customized drawings. The next stage will be the deployment of the APS module to enable both operational planning and volumetric-calendar scheduling.

El 6 Develops MES System to Manage Multi-Stage Production
120 PROFESSIONALS FOR EL 6 NOVOCHERKASSK TO TAKE PART IN TRIAL TALENT DEVELOPMENT PROGRAM FOR THE DON AREA'S INDUSTRY IN 2025
RECORD NUMBER OF GREEN ANODE BLOCKS PRODUCED BY EL 6
EL 6 GROUP WILL HOLD THE 4th INTERNATIONAL CONFERENCE: THE ROLE OF CARBON GRAPHITE PRODUCTS IN INDUSTRY, ON MAY 21-23 IN KAZAN
EL 6 NOVOCHERKASSK COMPLETED A LARGE-SCALE INVESTMENT PROJECT TO UPGRADE WATER RECYCLING SYSTEM
EL 6 NOVOCHERKASSK STARTED PRODUCING GRAPHITED UHP ELECTRODES WITH A DIAMETER OF 750 MM ON NEEDLE COKE
EL 6 CONFIRMED COMPLIANCE WITH INTERNATIONAL STANDARD ISO 9001:2015 AND ITS RUSSIAN VERSION GOST R ISO 9001-2015
EL 6 JOINS TOP 16 BEST SUPPLIERS TO MMK
EL 6 NOVOSIBIRSK STARTS RAIL CONTAINER DELIVERIES
EL 6 NOVOCHERKASSK OPENED A NEW WAREHOUSE FOR FINISHED PRODUCTS
EL 6 NOVOSIBIRSK LAUNCHED A PACKING STATION
FOR CARBON-CONTAINING MATERIALS
REPRESENTATIVES OF 76 COMPANIES ATTENDED THE III INTERNATIONAL CONFERENCE OF THE EL 6 GROUP
ROMAN MUZYKA IS APPOINTED AS THE GENERAL DIRECTOR OF EL 6
EL 6 COMPANY TO HOLD THE III INTERNATIONAL CONFERENCE: THE ROLE OF GRAPHITE AND CARBON-BASED PRODUCTS IN INDUSTRY ON MAY 15 TO 17 IN SUZDAL
MEDICAL CENTER SUPPORTED BY EL 6 NOVOCHERKASSK OPENS IN NOVOCHERKASSK INDUSTRIAL DISTRICT
EL 6 HAS ESTABLISHED A NEW PROFESSIONAL TRAINING PROGRAM FOR CARBON-AND-GRAPHITE INDUSTRY PROFESSIONALS
EL 6 WAS CERTIFIED FOR COMPLIANCE WITH INTERNATIONAL ISO 9001:2015 STANDARD AND ITS RUSSIAN COUNTERPART GOST R ISO 9001-2015
EL 6 GROUP HOLDS THE 2ND INTERNATIONAL CONFERENCE: THE ROLE OF GRAPHITE AND CARBON-BASED PRODUCTS IN METALLURGY
EL 6 TO HOLD THE SECOND INTERNATIONAL CONFERENCE: THE ROLE OF GRAPHITE AND CARBON-BASED PRODUCTS IN METALLURGY ON MAY 18-19 IN KALININGRAD
THE ANODE BLOCK BAKING LINE RESUMED OPERATION AT EL 6 CHELYABINSK
MINISTRY OF DIGITAL DEVELOPMENT, COMMUNICATIONS AND MASS MEDIA OF THE RUSSIAN FEDERATION TO SUPPORT EL6 GROUP
EL 6 LAUNCHES A PROJECT TO DEVELOP PRODUCTION SYSTEM
EL 6 GROUP RELEASES ELECTRODER'S VOCABULARY IN HONOR OF METALLURGIST'S DAY
EL 6 GROUP HELD THE FIRST PRODUCTION AND TECHNICAL CONFERENCE THE ROLE OF CARBON-GRAPHITE PRODUCTS IN METALLURGY
CONSOLIDATION OF ASSETS OF EL 6 (FORMERLY EPM GROUP) HAS BEEN COMPLETED
“EL 6” TOGETHER WITH “IES-GARANT” IMPLEMENT A PROJECT ON ENERGY SAVING
REPRESENTATIVES OF THE EL 6 COMPANY SPOKE AT THE 13TH INTERNATIONAL CONFERENCE "CARBON 2021"
MIKHAIL NOVIKOV APPOINTED EL 6 ACTING HR DIRECTOR
DEVELOPMENT OF "DIGITAL PLANT" PROJECT IS IN PROGRESS AT “EL 6” PRODUCTION SITES
METALLOINVEST RANKS EL 6 HIGH
EPM GROUP ANNOUNCES REBRANDING
SERGEY STEPANOV WAS APPOINTED TO THE POSITION OF GENERAL DIRECTOR OF EPM GROUP
12 SCHOOL TEACHERS TRAINED WITH SUPPORT OF EPM GROUP
EPM GROUP CONSOLIDATES BUSINESSES
IGOR GRECHIN HAS BEEN APPOINTED TO THE POSITION OF MANAGING DIRECTOR OF INFORMATION TECHNOLOGIES OF EPM GROUP
EPM GROUP SIGNED AGREEMENT TO DELIVER GREEN ENERGY
SERGEY ELKOV WAS APPOINTED TO THE POSITION OF THE MANAGING DIRECTOR OF EPM-NOVOCHERKASSK ELECTRODE PLANT
EPM GROUP IS A NEW TEACHER FOR RUSSIA PARTNER
NIKOLAY BELYAEV HAS BEEN APPOINTED TO THE POSITION OF THE PROCUREMENT DIRECTOR OF EPM GROUP
EKATERINA GVOZDEVA WAS APPOINTED FINANCIAL DIRECTOR OF EPM GROUP
DONCARB GRAPHITE LAUNCHED A NEW PRODUCT FOR POWER GENERATION
EPM GROUP AND GOVERNMENT OF THE CHELYABINSK REGION SIGN ENVIRONMENTAL AGREEMENT
DEPUTY MINISTER OF TRADE AND INDUSTRY OF THE RUSSIAN FEDERATION VASILY OSMAKOV VISITS EPM-NEP
GREEN GRAPHITE EXPANDS ITS SERVICE PACKAGE AND LAUNCHES A WEBSITE.
DONCARB GRAPHITE TO TAKE PART IN THE KHIMIA 2020 EXHIBITION
EPM GROUP AND NSTU SIGN A STRATEGIC PARTNERSHIP AGREEMENT
THE EPM GROUP LAUNCHES THE SPANISH VERSION OF THEIR CORPORATE SITE
EPM AND NSTU TO TRAIN TECHNICAL EXPERTS
EPM-NOVOCHERKASSK ELECTRODE PLANT CONFIRMED THE COMPLIANCE OF THEIR MANAGEMENT SYSTEM
DONCARB GRAPHITE STARTS SELLING ISOSTATIC GRAPHITE AT A SPECIAL PRICE
Unique anodes by EPM Group for magnesium electrolyzers go to serial production
EPM-NOVOSIBIRSK ELECTRODE PLANT CONFIRMS COMPLIANCE OF THE MANAGEMENT SYSTEM WITH INTERNATIONAL STANDARDS
DONCARB GRAPHITE COMPLETES THE COOLING SYSTEM UPGRADE INVESTMENT PROJECT
EPM GROUP PUT INTO OPERATION MODERN FOUR-CHAMBER DIRECT HEATING GRAPHITE FURNACE
JSC "EPM-MANAGEMENT" is included in the list of systemically important companies of the Russian economy
EPM Group implementes a set of employee protection measures
Nikolay Naumov has been appointed as CEO of EPM-MANAGEMENT
EPM-NovEP expands the range of laboratory studies of cathode products
EPM-NovEP receives a new EIRICH mixing plant
EPM Group completes project as part of cpecial investment contact
Doncarb Graphite completes overhaul of its press
EPM group inaugurated the new RIEDHAMMER furnace at EPM-NEZ
Construction of a modern RIEDHAMMER furnace complete at EPM – NEP
EPM-Chelyabinsk Electrode Plant shuts down anode production
EPM-NovEP launches an EIRICH mixing plant to celebrate the 45th anniversary of the production site
EPM-NOVEP INTRODUCED A NEW RING COAL-TAR LINE
EPM-NOVEP LAUNCHED THE ASSEMBLY OF THE GERMAN EIRICH MIXING PLANT
The Ministry of Industry and Trade of the Russian Federation, Government of the Rostov Oblast, and the EPM Group has signed a special investment contract valued at 2.7 bln rubles
Novosibirsk marked the opening of a traveling photo exhibition dedicated to the 45th anniversary of the EPM – Novosibirsk Electrode Plant
A robot-assisted nipple manufacturing centre has been officially commisioned at EPM-NEP
EIRICH Mixing Plant Arrives at EPM-NovEP
Preparatory works for installation of the German mixing plant EIRICH have started at EPM-NovEZ
Equipment Delivered to EPM-NEP Nipple Centre
New Equipment for Production of Electrode Paste Briquettes Put into Operation at EPM-NovEP
Donсarb Grafit has put new equipment into operation
EPM-NEP will have new high-precision measuring equipment for graphite electrode nipples
Novocherkassk Electrode Plant Started Preparatory Works for New RIEDHAMMER Furnace
ENERGOPROM Group Announces Rebranding
ENERGOPROM Group Put Into Operation the First Private Environmental Monitoring Station in Chelyabinsk
ENERGOPROM has commissioned a new pitch impregnation line at Novocherkassk Electrode Plant
Novocherkassk Electrode Plant launches modernized baking furnace
Evgeniy Churikov Appointed Managing Director of Novocherkassk Electrode Plant
The Chelyabinsk plants of ENERGOPROM Group present their environmental initiatives to regional experts
Acting Governor of Novosibirsk Region Andrei Travnikov Makes a Working Visit to Novosibirsk Electrode Plant
ENERGOPROM Group takes part in a discussion of prospects for development of the coal and graphite industry in Russia
ENERGOPROM Group and SOLVER signed an agreement for construction of the Nipple Center at Novocherkassk Electrode Plant
Chelyabinsk Branches of ENERGOPROM Have Created an Integrated Environmental Center
ENERGOPROM Group and EIRICH GMBH have executed a contract for continuous intensive Mixer for the Novosibirsk Electrode Plant
TMK and ENERGOPROM signed a long-term contract for graphite electrodes supply
ENERGOPROM and RIEDHAMMER GmbH started construction of a new furnace at Novocherkassk Electrode Plant
RUSAL and ENERGOPROM Entered Into a Long-Term Anode Block Supply Contract
Chelyabinsk Electrode Plant's Output Increased 40 % in 2017
RUSAL and ENERGOPROM Sign a Long-Term Contract for Supply of Graphite Products
The Quality Management System at the Chelyabinsk Electrode Plant Certified by International Auditors
ENERGOPROM Group Developed Conceptually New Product for Emirates Global Aluminium
ENERGOPROM Group Made General Agreement for Cooperation with 1C
ENERGOPROM Group announces the request for quotation to the lot of UHP and SHP graphitized electrodes
Announcement
ENERGOPROM Group started production of the UHP-610 graphite electrodes at the Novosibirsk Electrode Plant
Statement from energoprom group on the special safeguard investigation into graphitized electrodes
Energoprom Launches Facebook Account